Skip to content
Safe LiftSYSTEMS

Installing a lift in an older Toronto building

Most Toronto shops move into buildings that were never planned for a lift. We check the ceiling, the slab and the power before we quote, and we install lifts bought elsewhere too.

Buildings with a past

A 2017 City study on the Port Lands and South of Eastern says that, over the years, new users moved in by reusing existing industrial buildings. It describes the City's works yard on Eastern Avenue and Booth Avenue as an 18-acre site with adaptable industrial buildings.

Reused space can suit a shop well. It can also hide a thin slab, a low beam or an electrical panel with no room left.

Studios in the Port Lands made reuse work by choosing buildings that suited them. A shop has to be just as picky. Ask about the floor, the roof height and the panel before you commit to a unit.

Measuring the height you really have

The same study warns that converted warehouses often have low ceilings with limited clear span. For a lift, clear height is measured to the lowest thing over the bay: a beam, a heater, a light, a sprinkler line or a door track.

A clearfloor two-post needs a lot of it. If the number comes up short, a baseplate two-post, a low-rise, a scissor or a four-post may still do the job.

In East York, the City's Laird in Focus study describes large-format, low-rise buildings around Laird and Eglinton. Low-rise can still mean a high roof, or a low one. We measure every time.

Slab first, anchors second

Every lift maker sets a minimum concrete thickness, and heavier lifts can need more. We check the spec for your lift against your floor before anyone drills.

Old floors have carried all kinds of loads. That doesn't tell you what is under the surface, or whether it was cut and patched for a past tenant. We check.

Tell us if the unit once had pits, trenches or floor drains. Those spots change where a lift can go.

If the slab won't take anchors, a freestanding four-post, a set of mobile columns or a new engineered pad may be the way to go.

Leases, zoning and power

In a leased unit, get the landlord's written OK before anything is anchored or wired. We give you the lift's needs for slab, height and power so that talk happens early.

Zoning matters too. Bill 97 changed the Planning Act meaning of an area of employment. The City says manufacturing, warehousing and related research are its primary uses, and stand-alone retail and office are not permitted. Ask the City what your unit allows before you sign.

Building permits and electrical work are not part of our install. We write down what the lift needs so your electrician can plan.

Bought your lift somewhere else?

We install lifts bought elsewhere, new or used. Send the make, the model and the install manual. If you haven't paid yet, send the spec sheet and your ceiling height first, so you don't end up with a lift the building can't take.

Ontario Regulation 851, section 51(1)(b), calls for a lift to be thoroughly examined by a competent person "prior to being used for the first time". We inspect lifts as well, so that exam can be booked with the install.

Common questions

Can you put a lift in a converted warehouse?

Often, yes. We measure the clear height to the lowest obstruction, check the slab spec for the lift you want and look at your power. If one lift won't fit, we tell you which one will.

I rent my unit. What do I need from my landlord?

Written approval to anchor the lift and to add any wiring. We give you the lift's slab, height and power needs, so the request is clear.

Will you install a lift I bought online?

Yes. Send us the make, the model and the manual. We check it against your bay before we book the install, and if it won't suit your building, we say so.

Do you handle permits and electrical?

No. Building permits and electrical work are separate from our install. We give you and your electrician the lift's power requirements in writing.

Can the first-use exam happen on install day?

We can book it with the install. Section 51(1)(b) of Ontario Regulation 851 calls for the exam before the lift is used for the first time.

Pricing a new lift?

Send your ceiling height and what you work on. You get one price for the lift, delivery and install.