Vehicle lift service for St. Thomas shops and fleets
We inspect, repair, install and sell vehicle lifts for St. Thomas repair shops, dealer bays and fleet garages, from Talbot Street to the employment lands in the city's northeast. Call 416-771-0499 to book a visit or ask for a quote.
A manufacturing city adding a gigafactory
St. Thomas built its economy on manufacturing, and the Official Plan credits a skilled workforce and strong rail and road links for keeping that base growing.
The newest addition sits in the city's northeast: a PowerCo battery cell plant meant to reach 90 GWh of annual capacity, on roughly 370 acres for the factory and up to 1,500 acres once the surrounding supplier park is built out. Production is targeted for 2027, with up to 3,000 direct jobs expected on site.
Where the shops and bays sit
The Official Plan splits industrial land into two tiers, so heavier work stays apart from homes and lighter businesses.
- Employment: the main tier, covering manufacturing, warehousing, offices and related retail, clustered in the northeast.
- Business Employment: a lighter-standard tier on the edge of the employment area, for research and development, offices and automotive service uses, all inside fully enclosed buildings.
- The City aims to hold enough designated employment land to meet demand through 2037.
New lanes on Highway 3 and 4
Highway 3 is being twinned with two extra lanes between Ron McNeil Line and Centennial Avenue, passing through St. Thomas, Central Elgin and Southwold.
A new Talbotville Bypass will connect that twinned highway to Highway 4. Highway 4 itself is being widened from two lanes to four.
Inside the city, Talbot Street stays the main commercial spine, gatewayed at First Avenue. Highbury Avenue, Wellington Road, Sunset Drive and South Edgeware Road frame the employment lands around it, named in the Official Plan as the boundary arterial roads for that area.
Every lift inspected, once a year at least
Ontario Regulation 851, section 51(1)(b), sets the same rule for every lift in the province. It says a lift shall "be thoroughly examined by a competent person to determine its capability of handling the maximum load as rated", first "prior to being used for the first time" and then "at least once a year".
When we visit your St. Thomas shop, we look at every lift on site in that one visit. Each one gets inspected and recorded on its own. The work follows ANSI/ALI ALOIM:2020, and you get a signed record for every lift.
Repairs for dealer, fleet and trade bays
The Official Plan's Business Employment designation specifically allows automotive service uses alongside manufacturing and office work.
Tell us the make, model and what the lift is doing wrong when you call 416-771-0499.
Fitting a lift to an old or a new building
Talbot Central's buildings are multi-storey and street-facing, with little room behind them for backlot development, according to the Official Plan.
Whichever part of St. Thomas you're in, we check your slab, ceiling height and power before we recommend a lift or quote an install. Building permits and electrical work aren't part of that scope. We install lifts bought elsewhere, and we look at trade-ins and used lifts case by case.
Where we work in St. Thomas
Industrial areas
- The Official Plan clusters manufacturing, warehousing, offices and ancillary retail in the northeast part of the city, citing a skilled labour force and strong rail and road access.
- The Plan splits industrial land into two designations, Employment and Business Employment, so heavier uses are separated from nearby homes and businesses.
- Business Employment land is meant for light industry, research and development, offices and automotive service uses, all inside fully enclosed buildings with landscaped street frontage.
- The City aims to keep enough designated employment land on hand to meet growth to the year 2037.
Main corridors
- Highway 3 is being twinned with two extra lanes between Ron McNeil Line and Centennial Avenue, running through St. Thomas, Central Elgin and Southwold.
- A new Talbotville Bypass will link the twinned Highway 3 to Highway 4, and Highway 4 itself is being widened from two lanes to four.
- The Official Plan calls Talbot Street the city's main commercial spine, with its eastern gateway at the Talbot Street and First Avenue intersection.
- Highbury Avenue, Wellington Road, Sunset Drive and South Edgeware Road are named as boundary arterial roads around the city's employment lands.
Public fleets and yards
- Railway City Transit runs the city's conventional routes plus an on-demand Parallel Transit service for riders who need it.
- The City's Roads and Transportation Services division looks after road upkeep, winter control, its own fleet, active transportation, transit and taxi licensing.
- Management and operation of the St. Thomas Municipal Airport is under the control of City Council.
The local repair economy
- St. Thomas grew up as a manufacturing centre, and the Official Plan points to an active Economic Development Corporation working to keep that base growing.
- Business Employment land explicitly permits automotive service uses alongside manufacturing, research and office work.
- PowerCo's battery cell plant in the city's northeast is expected to bring up to 3,000 direct jobs, with production targeted to start in 2027.
- At full build-out the plant is meant to reach 90 GWh of annual capacity, with roughly 370 acres set aside for the cell factory and up to 1,500 acres for the wider supplier park.
Buildings and bays
- Talbot Central's buildings are described in the Official Plan as multi-storey, street-facing structures with little room behind them for backlot development.
Finding your way
- A life-sized Jumbo the Elephant monument stands on Talbot Street, marking the 1885 railway accident that made the city famous.
- Talbot Central, the historic downtown core, carries the city's heaviest concentration of ground-floor retail and office space.
- The St. Thomas Municipal Airport sits outside the city in the Township of Yarmouth and is treated in the Official Plan as part of the city's transportation system.
Services and nearby areas
Lift questions from St. Thomas
Do you serve shops in St. Thomas?
Yes. We come to shops across the city, from Talbot Street downtown to the employment lands in the northeast. Call 416-771-0499 to book an inspection, a repair or a quote.
Will you inspect all the lifts in my shop at once?
Yes. One visit covers every lift, and each lift is inspected and recorded on its own, following ANSI/ALI ALOIM:2020.
Do you install lifts we didn't buy from you?
Yes. Tell us the make and model, and we check your slab, ceiling height and power before we book the install. We also look at used lifts and trade-ins case by case.
Is there a legal minimum for how often our lifts get checked?
Ontario Regulation 851, section 51(1)(b), says a lift shall be examined "not less frequently than recommended by the manufacturer and in any case, at least once a year, and a record shall be kept, signed by the competent person doing the examination". That is a provincial rule, so it applies in St. Thomas the same as everywhere else in Ontario.
Can you put a lift into a building in Talbot Central?
Yes, after we check it. The Official Plan describes Talbot Central's buildings as multi-storey and street-facing, with little room behind them. We check the slab, ceiling height and power in your bay, then tell you what the lift needs before anything is ordered.
Sticker running out?
Book your annual inspection. We inspect every lift in the shop in one visit, with a signed record for each.