Skip to content
Safe LiftSYSTEMS

Single-phase or three-phase power for a lift

Most commercial lifts run on 220 volt single-phase power, and some models can be ordered with a three-phase power unit. Know what your building has before you order.

Planning the bay / Checked

What most lifts run on

Most commercial two-posts run on 220 volt single-phase power. BendPak lists 220 VAC, 60 Hz, 1 phase for its 10APX two-post. Its HD-9 four-post manual lists the same as the standard power unit, with special voltages available on request.

Power is set by the power unit the lift ships with, so the spec is per model and per power unit option, not per brand.

When three-phase is an option

Some lifts can be ordered either way. BendPak's 10AP series manual lists these power unit choices, and notes that 110 VAC power units are not available for that series.

Smaller and portable lifts vary more. BendPak's MDS-6 mid-rise scissor manual lists 110 VAC single-phase and 208 to 230 VAC single-phase units. Its PCL-18B portable column lift lists a 208 to 240 V three-phase motor.

  • 220 VAC, 60 Hz, 1 phase, for North America
  • 208-240/380/460 VAC, 50/60 Hz, 3 phase
  • 220 VAC, 50/60 Hz, 1 phase, for countries outside North America

Why the phase has to match

A power unit is built for one kind of supply. A three-phase unit needs three-phase service at the bay, and plenty of industrial units and older buildings don't have it.

So order the power unit to match the building, not the other way round. If you are unsure what you have, the panel label and your electrician will tell you before anything is ordered.

Amps, breakers and disconnects

The exact amperage and breaker size come from the installation manual for your lift and its power unit. Don't size a circuit from a brochure.

The ANSI/ALI ALIS standard says the owner should provide individual connections for each lift, including a separate electrical disconnect for each lift. BendPak's 10AP manual notes that the power disconnect and thermal disconnect for a three-phase unit are not supplied with the lift and are installed by a licensed electrician.

Who does the electrical work

ALIS says electrical work outside the lift itself follows the Canadian Electrical Code, CSA C22.1, and that changes to power wiring or service connections are done by, or under the direct supervision of, a licensed electrician.

Our lift installation work doesn't include electrical work or building permits, which is normal in this trade. We tell you what power the lift needs, so your electrician knows what to prepare.

In a new building where permanent power isn't in yet, ALIS notes a temporary connection may be needed to test the lift, and it has to be removed when the install is done.

What to find out before you order

Our shop layout planning guide has space to record these for every bay. The short version:

  • Building service: single-phase or three-phase
  • Panel voltage and main breaker, from a photo of the panel label
  • Free breaker spaces in the panel
  • Distance from the panel to each planned bay
  • Other equipment going in at the same time, like a compressor or tire changer

Common questions

Can a two-post lift run on 110 volts?

Most commercial two-posts run on 220 volt power. BendPak says 110 VAC power units are not available for its 10AP series. Some smaller lifts do list a 110 volt option, such as BendPak's MDS-6 mid-rise scissor, so check the manual for the exact model.

My building has three-phase power. Can I get a three-phase lift?

Some models offer it. BendPak's 10AP series manual lists a three-phase power unit at 208-240/380/460 VAC, 50/60 Hz. The power unit is chosen when the lift is ordered, so tell us what service your building has before we quote.

Does each lift need its own disconnect?

The ANSI/ALI ALIS standard says the owner should provide individual electrical connections for each lift, including a separate electrical disconnect for each lift. Your electrician wires it to the Canadian Electrical Code.

Is electrical work included in your lift install?

No. Our lift installation work doesn't include electrical work or building permits, which is normal in this trade. We give you the power requirements from the lift's manual so your licensed electrician can get ready.

Pricing a new lift?

Send your ceiling height and what you work on. You get one price for the lift, delivery and install.