With several bays, where one lift goes shapes the next. Plan the whole floor once, before the first lift is bought.

Planning the bay / Checked

Plan the whole shop, then buy

In a single bay you fit the lift to the room. With three or more, every choice affects the bays beside it: traffic, doors, power runs, air lines and building columns.

Our shop layout planning guide lists what to measure at each bay. This article covers how the bays work together.

Traffic and the inside driveway

The ANSI/ALI ALIS standard says bays are usually set to the left and right of an inside driveway, and that the driveway ideally lets vehicles drive through. It says having to back vehicles out of an inside driveway is not desirable.

ALIS also asks for enough clearance behind each lift for other vehicles to pass into and out of the next bays, and for the bay doors to close.

Room around each lift

ALIS asks for room in front of and beside each lift to place vehicles and still walk past comfortably. It asks you to allow for workbenches, toolboxes and vehicle doors opening. On heavy-duty lifts, it asks for side room to handle heavy wheel and tire assemblies with equipment.

Widths add up fast. BendPak publishes 135 to 145 inches of overall width for its 10,000 lb two-posts. A four-post that fits the width of a bay may not fit its length once the approach ramps are counted. The maker's installation drawing sets the clearances for each model.

Controls in a row of lifts

ALIS says the operator must be able to see the lift and the vehicle while standing at the controls. It calls placing the controls of adjacent lifts close together potentially dangerous, because someone could run the wrong lift.

If controls must be close, ALIS says to mark clearly which lift each one runs, and not to place controls where they block a quick way out. Decide which side each lift's power unit goes on with the next bay in mind.

Power and air to every bay

ALIS says the owner should provide individual connections for each lift, including a separate electrical disconnect and a separate compressed air drop for each lift. The shop air system should have filter-dryers so each lift gets clean, dry air.

Plan the panel for every lift plus the compressor and other equipment at once. Wiring is a job for a licensed electrician.

Mixing lift types

Many shops pair two-posts for general repair with one specialty bay, like a scissor for tire work or an alignment rack. Put the specialty bay where its work flows best.

Each type brings its own site needs. An alignment four-post has to be installed level to the aligner maker's tolerance, which may mean shimming or a pour. A heavier-capacity bay can need thicker concrete than the rest. Mobile columns need a clear, flat path between bays, and building pillars can block it.

Allow time for the slow parts

ALIS notes that lift equipment can arrive from different places on different days, and that an install can run over several weeks while concrete cures or electrical service is finished. It recommends storing equipment indoors, access-controlled and away from vehicle traffic.

Building permits and electrical work are arranged separately from our install, so start those early.

Common questions

How far apart should lifts be in a multi-bay shop?

There is no single number. The lift maker's installation drawing sets the clearances for each model. The ANSI/ALI ALIS standard asks for room to place vehicles, walk past, open vehicle doors and fit benches and toolboxes. We check your measurements against the drawing.

Can two lifts share one electrical disconnect?

The ANSI/ALI ALIS standard says the owner should provide individual connections for each lift, including a separate electrical disconnect for each lift, and a separate air drop where the lift uses air.

Where should lift controls go when lifts are side by side?

Where the operator can see the lift and the vehicle while standing at the controls. ALIS calls placing adjacent lifts' controls close together potentially dangerous. If they must be close, each set has to be clearly marked, and controls must not block a quick way out.

What should I measure first?

Clear ceiling height at each bay, door openings, bay width and depth, building columns, the slab and the power. Our shop layout planning guide lists each measurement, and it is worth filling in before a site visit.

Pricing a new lift?

Send your ceiling height and what you work on. You get one price for the lift, delivery and install.